
The project comprised the construction of a 44,000 m² factory, with all bulk earthworks, civil works, and detailed excavation completed. All footings and basecourse were constructed to a tolerance of less than 5 mm, and a dedicated cell was excavated for an on-site detention (OSD) tank. The works also included the construction of 600 m² of keystone retaining walls supported by both earth straps and no-fines concrete. Two car parks were completed, incorporating 6,700 m² of asphalt, 1,600 m of kerb and gutter, and 1,200 m of subsoil drainage. In support of these works, the transport team imported 1,650 tonnes of basecourse and drainage aggregate to site.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.