
The Brickworks Plant 2 project involved extensive civil upgrades, including the installation of 45,000 m² of external pavement, stormwater drainage, earthworks, retaining walls, access ramps, and pavement and erosion control measures. The Plant 2 Hardstand Extension added additional hardstand areas with pavement grading, integrated stormwater systems, bulk earthworks across multiple phases (1A, 1B, 1C, and 3), drainage and detention basin extensions, and comprehensive erosion and sediment control measures to support ongoing operations.